| Tweet | 
 
  
    Custom Search
   
 | 
      
         | 
 
       | 
		||
        ![]() TM 9-2330-313-14&P 
0039 00
 
 
ECU VALVE REPLACEMENT - Continued 
ECU VALVE REMOVAL 
1. Open drain valves on reservoirs and allow air to escape. 
2. Tag and disconnect sensor cables (7) from ECU valve (10). 
3. Disconnect electrical cable (9) from ECU valve (10). 
4. Remove hoses (5), plug (4), and fittings (6 and 8) from ECU valve (10). 
5. Remove two locknuts (1), washers (2), and bolts (3) from ECU valve (10). Discard locknuts. 
ECU VALVE INSTALLATION 
1. Apply sealing compound (sealant, silicone) to threads of plug (4), and fittings (6 and 8). DO NOT 
use Teflon tape. 
2. Install plug (4), and fittings (6 and 8) to ECU valve (10). 
3. Install ECU valve (10) on frame with two bolts (3), washers (2), and new locknuts (1). 
4. Install hoses (5) to ECU valve (10). 
5. Connect electrical cable (9) to the ECU valve (10). 
6. Connect all sensor cables (7) to the ECU valve (10). 
7. Ensure drain valve on air reservoir is closed. 
FOLLOW-ON TASKS 
Connect semitrailer to prime mover. 
Check for air leaks. (WP 0044 00) 
Raise landing legs. 
Remove/store chocks and ground boards. 
Verify proper/safe operation. 
END OF WORK PACKAGE 
END 
0035 
0039 00-3/4 Blank 
 | 
			||
![]()  | 
		||