Custom Search
 
  
 


TM 9-2330-331-14&P
0019 00
Table 4. Organizational PMCS - Continued
ITEM TO BE
ITEM
MAN­
EQUIPMENT
CHECKED OR
PROCEDURE
NO.  INTERVAL HOUR
NOT READY/
SERVICED
AVAILABLE IF:
NOTE
This should be checked every
6,000 miles or semiannually,
whichever period is shorter.
Semi-
14
a. Check studs and flange nuts for
Studs and
.25
Studs or flange
Annually
damage.
nuts are damaged,
Flange Nuts
loose, or missing.
NOTE
All flange nuts and studs have
right-hand threads.
b. Flange nut torque:
Torque flange nuts to 50 lb-ft
(67.8 Nm) and then tighten to 450­
500 lb-ft (610-678 Nm) using DRY
torque.
c. Torquing sequence is as follows:
1
8
10
6
3
4
5
9
7
2
Inspect cable for damage, or frayed or
.10
Spare Tire
Semi-
15
broken wires.
Hoist Cable
Annually
0019 00-10



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business