Custom Search
 
  
 


TM 9-2330-331-14&P
0019 00
Table 4. Organizational PMCS
ITEM TO BE
ITEM
MAN­
EQUIPMENT
CHECKED OR
PROCEDURE
NO.  INTERVAL HOUR
NOT READY/
SERVICED
AVAILABLE IF:
NOTE
Perform Operator/Crew PMCS
prior to, or in conjunction with,
Organizational PMCS if there is
a delay between daily operation
of the equipment and the
Organizational PMCS or regular
operator is not assisting/
participating.
Clean axle and suspension
system with low-pressure water
and fiber brush to allow for
careful inspection.
For the first 1,000 miles:
1
Torque suspension nuts to the
Suspension
Torque service
.50
Monthly
following in-service dry torque values:
Initial Torque
requirements/
schedule are not
met. NMC if nuts,
bolts are damaged.
1-5/16"-12 UNF
660 lb-ft (895 Nm)
7/8"-14 UNF
460 lb-ft (624 Nm)
3/4"-16 UNF
300 lb-ft (407 Nm)
5/8"-18 UNF
180 lb-ft (244 Nm)
NOTE
New replacement installations/
hardware should have wet (oiled)
fasteners. The following wet
torque values apply:
1-5/16"-12 UNF
600 lb-ft (814 Nm)
7/8"-14 UNF
350 lb-ft (474 Nm)
3/4"-16 UNF
220 lb-ft (298 Nm)
5/8"-18 UNF
130 lb-ft (176 Nm)



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business