Tweet |
Custom Search
|
|
|
||
TM 9-2330-331-14&P
0015 00
Table 3. Operator/Crew PMCS - Continued
ITEM TO BE
ITEM
MAN
EQUIPMENT
CHECKED OR
PROCEDURE
NO. INTERVAL HOUR
NOT READY/
SERVICED
AVAILABLE IF:
25
After operation, especially in mud, salt
After
N/A
Semitrailer
environment, or fording conditions, flush
Cleanliness
exposed area of axles, axle ends,
suspension, landing gear, underside/
topside of semitrailer and stowage box
with clean, low-pressure water, if mission
permits.
a. Clean and lubricate all parts as
specified in the WP 0022 00 to make
sure water/debris is flushed out of
system.
b. Check all electrical connections for
corrosion and security.
c. Make sure all painted surfaces are
touched up where necessary to
prevent rust.
NOTE
Mission requirements, urgency, safety,
and common sense should be
considered in determining NMC status
of semitrailer.
Weekly
26
Wheels
Cracks or leakage
.10
Check all wheels for cracks, between
are evident. Notify
and around stud holes and hand holds.
Organizational
Check all wheels for rust streaks and
Maintenance.
grease stains.
Monthly
27
Frame and
.10
Perform a visual inspection of semitrailer
Decking
for evidence of corrosion and condition of
deck wood. Visually check all welds for
rust and cracks. Notify Organizational
Maintenance if corrosion or deck damage
is evident.
END OF WORK PACKAGE
|
||