Custom Search
 
  
 


TM 9-2330-331-14&P
0007 00
SLINGING OPERATIONS
WARNING
All personnel must stand clear of semitrailer during slinging operation.
Only trained sling operations personnel should conduct this operation.
Failure to follow this warning may result in serious injury or death
to personnel.
CAUTION
Sling only an empty semitrailer or a semitrailer loaded with two
20 ft. (6.1 m) or one 40 ft. (12 m) container. Do not sling semitrailer in
any other configuration. Failure to follow this caution may result in
damage to equipment.
DO NOT sling semitrailer unless all four sling provisions are fully
extended and locked. Failure to follow this caution may result in
damage to equipment.
1. Remove sling provision locking pin (1).
2. Pull sling provision (2) to fully extended position. Put locking pin (1) back in to the lock pin hole. Repeat for
other sling provisions.
3. Attach lifting cables to sling provisions (2) and complete slinging operation.
4. On completion of slinging operation, remove lifting cables from sling provisions (2).
5. Remove locking pin (1) from sling provisions (2). Push sling provision into fully retracted position.
6. Put sling provision locking pin (1) back into hole.
7. Repeat steps 5 and 6 to stow other sling provisions (2).
1
2
Figure 21. Sling Provision and Locking Pin
END OF WORK PACKAGE



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business