Custom Search
 
  
 


TM 9-2330-330-14&P
VAPOR INTEGRITY TEST
THIS WP COVERS:
Pressure Test Preparation; Pressure Test Procedure; Vacuum Test Preparation; Vacuum Test Procedure
INITIAL SETUP:
Maintenance Level
Tools and Special Tools
Direct and General Support
Tool kit, general mechanic's (item 4, WP 0171 00 )
Equipment Conditions
References
Semitrailer disconnected from prime mover (refer
DOT 49CF180.407
TB 43-0212
DOT 49CFR180.409
Semitrailer grounded (refer to WP 0007 00)
DOT 49CFR180.415
NOTE
Testing personnel must be registered with DOT in
accordance with DOT regulation 49CFR180.409.
PRESSURE TEST PREPARATION
WARNING
Use extreme caution when walking or working on
the top of semitrailer. Walkway can become slippery
due to moisture or fuel spillage. Failure to follow
this warning may result in serious injury.
Before performing the pressure or vacuum test, the
semitrailer must be grounded to an approved (earth)
ground and must be safe to proceed. Failure to follow
this warning may cause a spark to ignite, resulting in
serious injury or death to personnel.
Make sure tank and piping system are free of all liquid
and that tank is purged of all fuel vapor (implement the
cleaning procedures, as applicable, refer to TB 43-0212).
Failure to follow this warning may cause a spark to ignite,
resulting in serious injury or death to personnel.
0168 00-1



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business