Custom Search
 
  
 


TM 9-2330-330-14&P
ENGINE SHROUD REPLACEMENT
THIS WP COVERS:
Removal, Installation, Follow-On Tasks
INITIAL SETUP:
Maintenance Level
Tools and Special Tools
Organizational
Tool kit, general mechanic's (item 4, WP 0171 00)
Equipment Conditions
Semitrailer disconnected from prime mover (refer
Semitrailer grounded (refer to WP 0007 00)
Negative terminal disconnected from battery (refer
REMOVAL
1.
Remove two thumb screws (6) and pan (5) from shroud (1).
2.
Remove two screws (7), washers (8), five bolts (9), washers (10), and shroud (1).
3.
Remove two screws (12) and rear shroud (11).
4.
Remove four bolts (2), washers (3), and shroud mount (4).
0148 00-1



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business