Tweet |
Custom Search
|
|
|
||
TM 9-2330-330-14&P
OPERATOR/CREW PREVENTIVE MAINTENANCE
CHECKS AND SERVICES (PMCS)--Continued
0034 00
Table 1. Operator/Crew PMCS--Continued.
NOT FULLY
PROCEDURE
ITEM TO BE
INTERVAL
ITEM NO.
MISSION
INSPECTED
CAPABLE IF:
19
During
Brake System
Apply semitrailer brakes and
Brakes do not stop
observe operation.
semitrailer, or
semitrailer pulls to
one side.
20
During
Piping System
a.
Check all valves and
Any fuel leaks are
couplings for leaks.
present.
b.
Check valves P and R for
Any air leaks are
proper operation.
present.
21
During
ABS Warning
If warning light stays on above 4
Light
mph (6 km/h), notify
Organizational maintenance
after completing mission.
22
During
Landing Gear
a.
With prime mover coupled Landing gear legs
to semitrailer, engage
cannot be raised or
landing gear handle and
lowered.
raise and lower landing
gear legs.
b.
Inspect landing gear
Ground boards are
ground boards for
required for
serviceability.
mission but are
dry-rotted.
c.
Wheel chocks for
serviceability.
23
During
Emergency
Make sure all valves are closed. Emergency valve A
Handles
Move emergency valve A
does not move to
control handle to open position. the closed position.
On front of semitrailer, pull one
emergency handle. Make sure
emergency handle has moved
to the closed position. Repeat
procedure for second
emergency handle.
0034 00-9
|
||