Custom Search
 
  
 


TM 9-2330-330-14&P
OPERATOR/CREW PREVENTIVE MAINTENANCE
CHECKS AND SERVICES (PMCS)--Continued
0034 00
Table 1. Operator/Crew PMCS--Continued.
NOT FULLY
PROCEDURE
ITEM TO BE
INTERVAL
ITEM NO.
MISSION
INSPECTED
CAPABLE IF:
17
Before
Towing
a.
Connect air lines of prime
Air leaks are
Connections
mover to couplings on
present.
semitrailer. With prime
mover engine running,
check air lines and
couplings for air leaks.
b.
Connect intervehicular
Turn signal and
cable of prime mover to
stop lights are not
couplings on semitrailer.
operating. Prime
Check all lights for
mover inter-
damage. Check to see that
vehicular cable is
all lights are operating, and
damaged (cuts,
check tightness of
cracks, and broken
connection at receptacle. If
wires).
tight, and lights still do not
operate, notify
Organizational
maintenance. Check cable
for damage.
18
Before
Brake System
a.
Check ABS warning light
ABS warning light
for flash.
does not flash or
stays lit.
b.
With prime mover coupled
Any leaks are
to semitrailer, apply prime
present.
mover brakes and inspect
semitrailer service and
emergency air brake
couplings and all air lines
and fittings for leaks. If
leaks are found, notify
Organizational
maintenance.
c.
Push in brake interlock
No slack adjuster
valve and observe slack
movement.
adjusters for proper
operation (refer to
0034 00-8



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business