Custom Search
 
  
 


TM 9-2330-330-14&P
OPERATOR/CREW PREVENTIVE MAINTENANCE
CHECKS AND SERVICES (PMCS)
THIS WP COVERS:
PMCS Procedures
INITIAL SETUP:
Maintenance Level
Tools and Special Tools
Operator/Crew
Tool kit, general mechanic's (item 4, WP 0171 00)
References
DA Form 2404
DA Form 5988-E
DA PAM 738-750
DD Form 314
GENERAL
To ensure that the M969A3 Semitrailer is ready for operation at all times, it must be inspected on a
regular basis so that defects may be found before they result in serious damage, equipment failure, or
injury to personnel. This WP contains systematic instructions on inspections, adjustments, and
corrections to be performed by Operator maintenance.
SERVICE INTERVALS
Perform the PMCS procedures listed in Table 1 at the following intervals:
Perform "Before" PMCS just before operating the semitrailer.
Perform "During" PMCS while operating the semitrailer.
Perform "After" PMCS immediately after operating the semitrailer.
Perform "Weekly" PMCS once a week.
Perform "Monthly" PMCS once a month.
Perform "Annual" PMCS once a year.
PMCS items and intervals are to be scheduled on DD Form 314 in accordance with DA PAM 738-750.
After operation in water, mud, or loose sand, clean the semitrailer as soon as possible. Lubricate without
waiting for the next scheduled service.
Lubrication instructions are included in WP 0035 00 (Operator/Crew).
0034 00-1



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business