Custom Search
 
  
 


TM 9-2330-330-14&P
OPERATION UNDER USUAL CONDITIONS--Continued
2.
BOTTOM LOADINGCURBSIDE AT COMMERICAL FACILITY
NOTE
Bottom Loading flow chart WP 0007 00-13.
a. Set semitrailer park brakes by functioning brake control valve (2) located on top of curbside
bottom load coupling or the one located at curbside vapor recovery outlet.
b. Dismount fire extinguishers (4) and bring them to the point of fueling operation.
c.
Ground and bond semitrailer to facility ground.



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business