Tweet |
Custom Search
|
|
|
||
TM 9-2330-329-14&P
G VALVE MAINTENANCE--Continued
0148 00
4.
Assemble handle (1) to valve (4) with bolt (2) and nut (3).
FOLLOW-ON TASKS
1.
Install G valve (WP 0118 00).
2.
Disconnect semitrailer grounding cables (WP 0007 00).
END OF TASK
0148 00-3/4 blank
|
||