TM 9-2330-329-14&P
PIPING FRAME ASSEMBLY REPLACEMENT--Continued
0147 00
2.
Install 26 bolts (12), 52 washers (11), 26 new self-locking nuts (10), and both sides of piping frame
(4) to semitrailer.
3.
Install three bolts (6), six washers (7), and three new self-locking nuts (8) to panel (9).
FOLLOW-ON TASKS
1.
Install main wiring harness (WP 0055 00).
2.
Install emergency valve A control handle (WP 0126 00).
3.
Install bottom loading valve (WP 0123 00).
4.
Install valve G (WP 0118 00).
5.
Install discharge manifold valve (WP 0122 00).
6.
Install manifold valve (WP 0124 00).
7.
Install static reel (WP 0084 00).
8.
Install F, E, and B valves and handwheels (WP 0121 00).
9.
Disconnect semitrailer grounding cables (WP 0007 00).
END OF TASK
0147 00-3/4 blank



 