Tweet |
Custom Search
|
|
|
||
TM 9-2330-329-14&P
TRUNNION TUBE AND HANGERS REPLACEMENT
THIS WP COVERS:
Removal, Installation, Follow-On Tasks
INITIAL SETUP:
Maintenance Level
Tools and Special Tools
Direct and General Support
Tool kit, general mechanic's (item 4, WP 0156 00)
Tool set, common no. 1 (item 1, WP 0156 00)
Materials/Parts
References
Self-locking nuts (4) (item 59, WP 0160 00)
Self-locking nuts (8) (item 112, WP 0160 00)
TB 9-2510-242-40
Equipment Conditions
Semitrailer disconnected from prime mover (refer
to WP 0007 00)
Semitrailer grounded (refer to WP 0007 00)
Semitrailer fuel tank drained (refer to WP 0007 00)
Leaf springs removed (refer to WP 0141 00)
Axles removed (refer to WP 0140 00)
REMOVAL
1.
Remove four self-locking nuts (3), bolts (4), and trunnion tube (2) from two trunnion hangers (5).
Discard self-locking nuts.
2.
Remove 8 self-locking nuts (6), 16 washers (7), and 8 bolts (8) from two trunnion hangers (5).
Discard self-locking nuts.
3.
Remove two trunnion hangers (5) from frame (1) (refer to TB 9-2510-242-40).
0139 00-1
|
||