Tweet |
Custom Search
|
|
|
||
TM 9-2330-329-14&P
ENGINE CONTROL PANEL MAINTENANCE
THIS WP COVERS:
Removal, Inspection, Installation, Follow-On Tasks
INITIAL SETUP:
Maintenance Level
Tools and Special Tools
Organizational
Tool kit, general mechanic's (item 4, WP 0156 00)
Materials/Parts
Equipment Conditions
Compound, silicone (item 6, WP 0159 00)
Semitrailer disconnected from prime mover (refer
Lockwashers (2) (item 6, WP 0160 00)
to WP 0007 00)
Lockwashers (3) (item 25, WP 0160 00)
Semitrailer grounded (refer to WP 0007 00)
Self-locking nut (item 6, WP 0160 00)
Negative terminal disconnected from battery (refer
Self-locking nuts (2) (item 11, WP 0160 00)
to WP 0007 00)
Self-locking nuts (2) (item 12, WP 0160 00)
Self-locking nuts (2) (item 46, WP 0160 00)
Self-locking nuts (4) (item 116, WP 0160 00)
Self-locking nuts (4) (item 117, WP 0160 00)
Starwashers (5) (item 7, WP 0160 00)
Rivets (4) (item 96, WP 0160 00)
Teflon nuts (6) (item 47, WP 0160 00)
REMOVAL
NOTE
Tag all wires and hoses prior to disconnecting.
1.
Remove six screws (1) from control panel frame (3) and pull control panel (2) down.
0114 00-1
|
||