Tweet |
Custom Search
|
|
|
||
TM 9-2330-329-14&P
DRAIN PIPES REPLACEMENT
THIS WP COVERS:
Removal, Installation, Follow-On Tasks
INITIAL SETUP:
Maintenance Level
Tools and Special Tools
Organizational
Tool kit, general mechanic's (item 4, WP 0156 00)
Materials/Parts
Equipment Conditions
Self-locking nuts (4) (item 88, WP 0160 00)
Semitrailer disconnected from prime mover (refer
Self-locking nuts (12) (item 92, WP 0160 00)
to WP 0007 00)
Semitrailer grounded (refer to WP 0007 00)
Spare tire dismounted (refer to WP 0007 00)
REMOVAL
NOTE
There are two drain pipes and they are both replaced the
same way. This procedure replaces the curbside drain pipe.
1.
Remove self-locking nut (1), two washers (2), and one bolt (3) from channel (4) at top of drain
pipe (5). Discard self-locking nut.
2.
Remove two self-locking nuts (7), four washers (8), and two bolts (9) from platform support (10).
Discard self-locking nuts.
3.
Remove two self-locking nuts (11), four washers (12), and two bolts (13) from angle bracket (6).
Discard self-locking nuts.
0091 00-1
|
||