TM 9-2330-329-14&P
ORGANIZATIONAL PREVENTIVE MAINTENANCE
CHECKS AND SERVICES (PMCS)--Continued
0041 00
Table 1. Organizational PMCS--Continued.
ITEM NO.
INTERVAL
ITEM TO BE
PROCEDURE
NOT FULLY
INSPECTED
MISSION
CAPABLE IF:
5
Semiannual
Landing Gear
Check condition and operation
of landing gear. Inspect for
damage or wear. Replace
damaged parts (refer to
6
Semiannual
Bogie Assembly
a.
Position semitrailer on
hard level surface with
front resting on landing
gear. Jack and block
frame. Remove wheel
assemblies (refer to
NOTE
Clean axle and
suspension system
with water and fiber
brush to allow for
careful inspection.
b.
Inspect general condition
Any cracks or
of trunnion tube, axles,
damage are
and leaf springs. Look for
evident.
cracks or damage. If
cracked or damaged,
notify Direct Support
maintenance.
c.
Check tightness of U-
Any damage or
bolts and clips on leaf
wear is evident.
springs. Tighten loose U-
bolts and clips. If damage
or wear is evident, notify
Direct Support
maintenance.
0041 00-5