Custom Search
 
  
 


TM 9-2330-326-14&P
7-4. D-RINGS REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Tasks
Initial Setup:
Tools and Special Tools:
Materials:
Tool kit, general mechanic's (Item 4, Appendix B-3)
Oil, lubricating (Item 9, Appendix F)
Equipment Conditions:
References:
Landing legs down
Semitrailer disconnected from prime mover
TM 9-237
NOTE
There are eight D-rings and they are removed and installed the
same way. This procedure covers one D-ring.
See Paragraph 7-1 for additional service requirements and TM
9-237 for welding instructions.
a. Removal.
Remove welded bracket (1) and D-ring (2) from trailer. Discard bracket and deformed D-ring.
b. Installation.
Weld new bracket (1) onto trailer allowing for free movement of D-ring (2).



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business