Custom Search
 
  
 


TM 9-2330-326-14&P
6-29. STOWAGE BOX REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Tasks
Initial Setup:
Tools and Special Tools:
Materials:
Tool kit, general mechanic's (Item 4, Appendix B-3)
Oil, lubricating (Item 9, Appendix F)
Equipment Conditions:
References:
Landing legs down
Semitrailer disconnected from prime mover
Stowage box emptied
TM 9-237
Ground boards emplaced
General Procedure:
a. Removal.
1.
Remove weather stripping (5) from interior lip of storage box (4).
2.
Remove 8 locknuts (3), 16 washers (2), and 8 bolts (1) from stowage box (4). Discard locknuts.
3.
Remove stowage box (4) from semitrailer brackets (6).
NOTE
Replacement of stowage box side panels is a Direct Support
function (see Paragraph 72, Page 7-7). See TM 9-237 for welding
instructions.
Paint entire box before installation of door seals.
b. Installation.
1.
Place stowage box (4) on semitrailer brackets (6). Set on side and slide in box and then bolt.
2.
Install stowage box (4), 8 bolts (1), 16 washers (2), and 8 new locknuts (3).
3.
Install weather stripping (5) onto exterior lip of storage box (4).



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business