Custom Search
 
  
 


TM 9-2330-326-14&P
6-28. FLOOR DECK BOARDS REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Tasks
Initial Setup:
Tools and Special Tools:
References:
Tool kit, general mechanic's (Item 4, Appendix B-3)
Equipment Conditions:
Landing legs down
Semitrailer disconnected from prime mover
Tires chocked
Ground boards emplaced
NOTE
For  detailed  procedures
and/or
instructions
see
referenced "H" Section.
Deck screws must be ordered separately, they are not
part of a kit.
General Procedure:
a. Removal.
1.
Remove flat head screws (9) from 6 5/8" wide floor board (1) and remove floor board (1) from
-
semitrailer.
2.
Remove flat head screws (9) from 7" wide floor board (2) and remove floor board (2) from
semitrailer.
3.
Remove flat head screws (9) from 3 5/8" wide floor board (3) and remove floor board (3) from
-
semitrailer.
4.
Remove flat head screws (9) from 7" wide floor board (4) and remove floor board (4) from
semitrailer.
5.
Remove flat head screws (9) from 7" wide floor board (5) and remove floor board (5) from
semitrailer.
6.
Remove flat head screws (9) from 7" wide floor board (6) and remove floor board (6) from
semitrailer.
7.
Remove flat head screws (9) from 7" wide floor board (7) and remove floor board (7) from
semitrailer.
8.
Remove flat head screws (9) from 7" wide floor board (8) and remove floor board (8) from
semitrailer.
9.
Remove flat head screws (9) from 6-5/8" wide floor board (10) and remove floor board (10) from
semitrailer.



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business