Tweet |
Custom Search
|
|
|
||
TM 9-2330-326-14&P
This Task Covers:
a. Removal
b. Installation
c. Follow-On Tasks
Initial Setup:
Tools and Special Tools:
Equipment Conditions:
Tool kit, general mechanic's (item 4, Appendix B-3)
Semitrailer disconnecte d from prime mover
Landing legs down
Side boards removed
Tires chocked
Ground boards emplaced
General Procedure:
a. Removal.
1.
Remove two links (5), rivets (7), lanyards (6), and corner stakes (4). Discard rivets.
2.
Remove 13 links (8), rivets (10), lanyards (9) and side stakes (3). Discard rivets.
3.
Remove four links (13), rivets (11), lanyards (12), and side stakes (2). Discard rivets.
4.
Remove six links (16), rivets (15), lanyards (14), and side stakes (1). Discard rivets.
b. Installation.
1.
Install two corner stakes (4) using links (5), new rivets (7), and lanyards (6).
2.
Install 13 side stakes (3) using links (8), new rivets (10), and lanyards (9).
3.
Install four side stakes (2) using links (13), new rivets (11), and lanyards (12).
4.
Install six side stakes (1) using links (16), new rivets (15), and lanyards (14).
|
||