Custom Search
 
  
 


TM 9-2320-279-10-3
Operation Under Usual Conditions (Cont)
2-131. PREPARATION FOR STORAGE OR SHIPMENT.
a. Preparation for Storage (Long Term: 6 months or Longer).
(1)
Position vehicle in a suitable location to drain and pump out remaining
water.
(2)
Drain and flush foam tanks (para 2-132).
(3)
Flush pump and tank (para 2-130).
(4)
Perform Preventive Maintenance Checks and Services and Lubrication
procedures (para 2-97).
1
4
tfft00642p
1
3
2
(5)
Remove four discharge caps (1), main inlet cap (2), passenger side
auxiliary inlet cap (3), and direct tank fill cap (4).
tfft00514
5
(6)
Put MASTER DRAIN valve (5) in OPEN position.



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business