Custom Search
 
  
 


TM 9-2320-279-10-3
Preventive Maintenance Checks and Services (PMCS) (Cont)
2-97. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) TABLE
(CONT).
Table 2-9. Operator/Crew Preventive Maintenance Checks and Service (PMCS) (Cont)
NOTE: These checks are to be made in the order listed, within designated interval.
A-After Operation
D-During Operation
W-Weekly
M-Monthly
INTERVAL
ITEM TO BE INSPECTED PROCEDURE:
Item
Check for and have repaired, filled, or adjusted
NOT MISSION
No. A D W M
as needed.
CAPABLE IF:
WATER PUMP ENGINE.
7.
Radiator
WARNING
Cooling system components can become very
hot during operation. Make sure cooling
system components are cool prior to performing
PMCS.
a. Check radiator coolant level sight glass. Fill as
required. Refer to Table 2-10 Lubricating Chart.
b. Coolant level should be up to the maximum
working or fill limit.
tfft00174p
COOLANT LEVEL
SIGHT GLASS
COLD
CHECK LINE
2-50



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business