Custom Search
 
  
 


TM 10-6640-239-13 5-42 b. Refer to table 5-1 and connect wires as tagged to GND terminal post (38).  Remove tags. 14.  Install connector P1. a. Install connector P1 (33) and secure with four screws (34), eight washers (35), four lockwashers (36), and nuts (37). b. Refer to table 5-1 and connect wires as tagged to connector P1 (33).  Remove tags. 15.  Install current monitor. a. Install current monitor (28) and secure with four screws (29), eight washers (30), four lockwashers (31), and nuts (32). b. Refer to table 5-1 and connect wires as tagged to current monitor (28).  Remove tags. 16.  Install line contactor K2. a. Install line contactor K2 (25) and secure with four screws (26) and washers (27). b. Refer to table 5-1 and connect wires as tagged to line contactor K2 (25).  Remove tags. 17.  Install line contactor K1. a. Install line contactor K1 (22) and secure with four screws (23) and washers (24). b. Refer to table 5-1 and connect wires as tagged to line contactor K1 (22).  Remove tags. 18.  Install splicer block TB1-A, TB1-B, and TB1-C. a. Install splicer block TB1-A, TB1-B, and TB1-C (19) and secure with four screws (20) and washers (21). b. Refer to table 5-1 and connect wires as tagged to splicer block TB1-A, TB1-B, and TB1-C (19).  Remove tags. 19.  Install splicer block TB1-GND and TB1-NEUT. a. Install splicer block TB1-GND or TB1-NEUT (16) and secure with two screws (17) and washers (18). b. Refer to table 5-1 and connect wires as tagged to splicer block TB1-GND or TB1-NEUT (16). 20.  Install 3-Phase Current Transformer. a. Install 3-phase current transformer (11) and secure with four screws (12), eight washers (13), four lockwashers (14), and nuts (15). b. Refer to table 5-1 and connect wires as tagged to 3-phase current monitor (11). 21.  Install Snap Fasteners. Install snap fastener (7) and secure with screw (8), lockwasher (9), and washer (10). 22.  Assemble Main Power Panel Assembly. a. Install top panel (5) and panel assembly (4) to power distribution module and secure with five screws (3), 14 screws (1) and washers (2). b. Connect power input cables to Mod Lab A and Mod Lab B. c. Connect power input cable from generator.


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business