TM 10-6640-238-13
3-26
Section IV. PREPARATION FOR STORAGE AND SHIPMENT
Alphabetical Index
Paragraph Title
Paragraph
Air Shipment..................................................................................................................................................... 3-10e
Introduction....................................................................................................................................................... 3-10
Preparation for Shipment .................................................................................................................................. 3-10d
Prior to Placing Unit in Storage ........................................................................................................................ 3-10b
Storage Length and Readiness .......................................................................................................................... 3-10a
Storage Site Selection ....................................................................................................................................... 3-10c
3-10. INTRODUCTION.
This section contains information on administrative storage procedures. If additional information is required, refer to
TM 740-90-1.
a.
Storage Length and Readiness. Placement of equipment in administrative storage shall be for short periods of time
(1 to 45 days) when a shortage of maintenance efforts exists. Items shall be in mission readiness within 24 hours or
within the time factors as determined by directing authority. During the storage period, appropriate maintenance
records will be kept.
b.
Prior to Placing Unit in Storage. Before placing equipment in administrative storage, current maintenance services
and Preventive Maintenance Checks and Services (PMCS) evaluations shall be completed, shortcomings and
deficiencies shall be corrected, and all Modification Work Orders (MWOs) shall be applied. Drain water from
piping as follows (Refer to figure 2-9 for location of drain valves):
CAUTION
Failure to drain water from piping in climates below freezing may cause piping to
develop cracks and leak. Always drain piping of water.
NOTE
Draining may be accomplished quickly by applying slight air pressure to supply and
return lines.
1.
Remove two camlocks from under trailer.
2.
Open water tank drain valve.
3.
Open water system drain valve.
4.
Open return water drain valve.
5.
Open water pump drain valve
6.
Open pump suction drain valve
7.
Open water supply drain located in laboratory next to sump tank.
8.
Open sump tank drain in located in laboratory next to sump tank.
9.
Open water supply drain in located in laboratory next to hot water tank.
10. Open spigot in sink.
|
|