Tweet |
Custom Search
|
|
|
||
TB 9-2330-381-14-1
(s) Select two remaining 11-foot (3.4m) utility chains (39) and remaining utility load binder (40).
(t) Attach two utility chains (39) through transport tiedown rings (41) on each side of platform just forward
of each payload chock (8) and connect hook to each chain (39).
(u) Pass free end of utility chains (39) through both handles of both free payload chocks (8).
(v) Place free ends of both utility chains (39) at center of platform and tighten using utility load binder
(40).
2-31
|
||