Custom Search
 
  
 


TB 9-2330-381-14-1
2-2. LOADING AND UNLOADING ABLE PAYLOAD WITH MINE CLEARING BLADE ATTACHED (CONT)
(p) Select two 11-foot (3.4m) utility chains (36) and utility load binder (37).
(q) Route utility chains (36) through cargo tiedown rings (38) between tines of mine clearing blade on
each side of platform. Route chains (36) over top of tines.
(r) Connect utility chains (36) and tighten using utility load binder (37).
2-30



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business