Custom Search
 
  
 


TB 9-2330-330-14&P-1
INITIAL INSTALLATION (continued)
65. Ensure front right door frame (44) and front left door frame (42) are flush with the bottom of the
piping frame assembly.
66. Insert two plate spacers (50) between two capscrews (43) of front right door frame (44) and front
left door frame (42).
67. Tighten all capscrews (43) and jam nuts (16).
68. Ensure front panel G (42) and front panel F (45) are flush with the bottom of hose reel cabinet
(48). Tighten all capscrews (20) and jam nuts (16).
69. Tighten all capscrews (46) and jam nuts (16).
4-25



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business