Custom Search
 
  
 


TB 9-2330-330-14&P-1
INITIAL INSTALLATION (continued)
17. Insert ground rod storage tube (30) through three mounting brackets (164) and install with two
U-bolts (29), previously removed, four flat washers (163), and four self-locking nuts (165).
Torque self-locking nuts to 30-35 lb-ft (41-48 Nm).
NOTE
An assistant will help with Steps 22 and 23.
18. Position hose tube (31) on tube canister brackets (170) and (171) and three tube canister
brackets (164).
19. Install hose tube (31) on hose reel housing (25) and tube canister brackets (170) and (171) with
retaining straps (26), four flat washers (163), four J-bolts (32), and two self-locking nuts (165).
Torque self-locking nuts to 30-35 lb-ft (41-48 Nm).
20. Install hose tube (31) on three tube canister brackets (164) and fender (28) with three retaining
straps (26), three J-bolts (32), six flat washers (163), and three self-locking nuts (165). Torque
self-locking nuts to 30-35 lb-ft (41-48 Nm).
3-27



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business