Custom Search
 
  
 


TB 9-2330-329-14&P-1
FOLLOW-ON TASK (continued)
9. Install pipes (20) and (23) on two brackets (12) with two U-bolts (27), four new flat washers
(144), and four new self-locking nuts (146).
10. Install hazardous materials placard bracket (51) on vapor recovery pipe (47) with U-bolt (48),
two new flat washers (144), and two new self-locking nuts (146).
3-32



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business