Custom Search
 
  
 


TB 9-2330-329-14&P-1
INITIAL INSTALLATION (continued)
NOTE
An assistant will help with Steps 17 and 18.
17.
Position hose tube (27) on four mounting brackets (145).
18.
Install hose tube (27) on mounting brackets (145) with four retaining straps (21), four J-bolts
(26), eight flat washers (144), and four self-locking nuts (146). Torque self-locking nuts
to 30-35 lb-ft (41-48 Nm).
19.
Install marker light box (28) on hose tube (27) with two retaining straps (30), four J-bolts (29),
four flat washers (144), and four self-locking nuts (146).
3-26



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business