Custom Search
 
  
 


TB 9-2330-329-14&P-1
INITIAL INSTALLATION (continued)
8. Install electrical conduit (11) on semitrailer with three universal conduit clips (10) and three
thread forming screws (6).
9. Install retaining strap (12), previously removed, on tube canister bracket (151) and engine
compartment (13) with two flat washers (144), capscrew (143), and self-locking nut (146).
Torque self-locking nut to 30-35 lb-ft (41-48 Nm).
3-22



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business