Custom Search
 
  
 


TB 9-2330-329-14&P-1
INITIAL INSTALLATION (continued)
5. Install two drain hoses (4) on semitrailer with four universal conduit clips (5) and four thread
forming screws (6).
6. Install front placard support (8), previously removed, on front of semitrailer with four flat
washers (144), two capscrews (9), and two self-locking nuts (146). Torque self-locking nuts
to 30-35 lb-ft (41-48 Nm).
7. Install hazardous materials placard bracket (7) on front placard support (8) with four flat
washers (144), two capscrews (9), and two self-locking nuts (146). Torque self-locking nuts
to 30-35 lb-ft (41-48 Nm).
3-21



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business