Tweet |
Custom Search
|
|
|
||
replacement of planks, splices must be made over body frame
cross members.
c. Stowage Box (Semitrailer M270A1). Stowage
box
.21) is bolted at the top to side rail of body frame with nine
1/2 x 13/4 cap screws, l/2-inch lockwashers, 17/32-inch ID
plain washers, 1/2-inch hex nuts, and at the rear to right
longitudinal beam of chassis frame with six 1/2 x 11/4 cap
screws, 1/2-inch lockwashers, 17/32-inch ID plain washers, and
1/2-inch hex nuts. Each stowage box door is opened by pivot-
ing
latch
handles
out
of
recesses
in
door
and
turning
clock-
wise
one-quarter
turn,
then
pulling
door
outward
and
upward.
Hooks,
welded
to
doors,
are
inserted
in
slots in body frame
Each hinged door
side rails to secure doors in open position.
is secured to stowage box with eight 3/8 x
1
cap
screws,
3/8inch lockwashers, and 3/8-inch hex nuts.
d. Stowage Compartment (Semitrailers M270 and M269).
Plates, angles, and brackets, welded to top surface of front
end
(nose)
of
semitrailer,
form
body
of
stowage
compartment
Hinged doors of compartment are opened by pivot-
(fig. 22).
ing latch handles out of recesses in doors and turning clock-
Doors are
wise one-quarter turn, then pulling doors outward.
secured to compartment with sixteen 1/4 x 3/8 roundhead screws,
1/4-inch bolt size lockwashers, and 1/4-inch square nuts.
114
|
||