Custom Search
 
  
 


TM 9-2330-380-14&P
4-93. Unloading Procedure (XM1063 Only) (cont'd)
26. Remove release tool (4) from each air chamber and stow
on tool holder on air chamber.
27. Detach towing vehicle.
28. Remove tie down rings. Place them in bags and store
inside van body.
29. Install plastic plugs in tie down ring holes.
30. Connect electrical connector on left side of dolly.
31. Connect front and rear brake lines.
4-149 (4-150 Blank)



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business