| Tweet | 
 
  
    Custom Search
   
 | 
      
         | 
 
       | 
		||
        ![]() TM 9-2330-331-14&P 
0041 00
 
 
AIR LINE REPLACEMENT - Continued 
REMOVAL 
Remove hose ties and hose clamps as necessary. 
INSTALLATION 
1. Treat all threads with sealing compound (sealant, silicone) before replacing. 
2. Install hose clamps and hose ties as necessary. 
FOLLOW-ON TASKS 
Connect semitrailer to prime mover. 
Raise landing legs. 
Remove/store chocks and ground boards. 
Pressurize system and check for leaks (WP 0044 00-1). 
Verify proper/safe operation. 
END OF WORK PACKAGE 
0041 00-20037 00-2 
 | 
			||
![]()  | 
		||