TM 9-2330-330-14&P
MAINTENANCE ALLOCATION CHART (MAC)--Continued
0171 00
Table 1. MAC for SEMITRAILER, TANKER: 5000-GALLON, M969A3--Continued.
(1)
(2)
(3)
(4)
(5)
(6)
MAINTENANCE LEVEL
FIELD
SUSTAINMENT
TOOLS AND REMARKS
MAINTENANCE
GROUP
COMPONENT/ASSEMBLY
DEPOT EQUIPMENT
FUNCTION
NUMBER
UNIT
DS
GS
C
O
F
H
D
7203
Coupling, Pipe Clamp
Remove/
Replace
0.70
1, 4
Nozzle, Fuel and Oil
Repair
0.50
4
Clean
Screen
0.25
Strainer, Nozzle
Inspect
0.10
Coupling, Element
Pipe, Bent, Metallic
Remove/
Replace
4.00
1, 4
Valve and Elbow, Internal
Inspect
0.10
(A-Valve)
Remove/
Replace
0.50
4
Repair
2.50
4
Vent Assembly
Adjust
0.10
4
Remove/
Replace
0.67
1, 4
Repair
1.00
1, 4
Sensor, High Level
Remove/
Shutoff
Replace
0.50
4
Repair
1.00
1, 4
Valve, Butterfly
Remove/
Replace
0.50
1, 4
Repair
1.00
4
Valve, Gate (F-Valve,
Remove/
B-Valve, and E-Valve)
Replace
0.50
1, 4
Repair
1.50
4
Coupling Half, Quick
Remove/
Disconnect (Bottom
Replace
0.17
1, 4
Loading--Road Side,
Curbside, Recirculation)
0171 00-20
|
|