Custom Search
 
  
 


TM 9-2330-330-14&P
VAPOR INTEGRITY TEST--Continued
0168 00
1.
Open manhole cover (2), install test plate (3), and fasten securely.
2.
Ensure clamp ring (4) for manhole cover (2) is fastened securely.
3.
Ensure both 3-in. (diameter) cleanout caps (1) are fastened securely.
4
Ensure vapor vent valve (5), hood clamp (6), and hose clamps (7) are fastened securely.
5.
Remove dust cap (9) from vapor vent line (10).
6.
Attach coupling assembly (8) to vapor vent line (10).
7.
Attach regulator assembly (12) to coupling assembly (8) using two hose assemblies (11).
0168 00-3



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business