TM 9-2330-330-14&P
ENGINE AND PUMP CABINET FRAME REPLACEMENT--Continued
0158 00
23.
Install split coupling (6), new seal (7), two nuts (4), and bolts (5) at inlet T (8).
24.
Install four bolts (10), eight washers (11), and four new self-locking nuts (12) to side and bottom of
bottom loading support bracket (9).
25.
Install two washers (2) and new self-locking nuts (1) to U-bolt (3).
FOLLOW-ON TASKS
1.
Install muffler plate and muffler (WP 0115 00).
2.
Install alternator (WP 0116 00).
3.
Install air cleaner and hose (WP 0111 00).
4.
Install two hose tubes at engine cabinet (WP 0094 00).
5.
Install brake interlock valve (WP 0072 00).
6.
Install static reel (WP 0087 00).
7.
Install fuel tank (WP 0108 00).
8.
Install fuel lines (WP 0109 00).
9.
Install optic socket box (WP 0050 00).
10.
Install batteries (WP 0055 00).
11.
Disconnect semitrailer grounding cables (WP 0007 00).
END OF TASK
0158 00-17/18 blank
|
||