Tweet |
Custom Search
|
|
|
||
TM 9-2330-330-14&P
ADJUSTMENT
Reach down through manhole and grasp push rod to verify push rod has slight up and down movement.
FOLLOW-ON TASKS
1.
Adjust emergency valve cable (WP 0139 00).
2.
Reconnect negative battery terminal (WP 0007 00).
3.
Disconnect semitrailer grounding cables (WP 0007 00).
END OF TASK
0130 00-11/12 blank
|
||