TM 9-2330-330-14&P
NOTE
Steps 1-2 are only required if parts were removed.
1.
Install cam (39), links (40 and 41), and new cotter pins (43).
2.
Install pins (35) in shaft assembly (36).
3.
Rotate shaft assembly (36) clockwise to line up pins on shaft assembly to allow it to be installed in
the body.
4.
Install new o-ring (29), new quad-ring (31), and bushing (30), in valve.
5.
Install pull lever (32), screw (33), and nut (28) in valve assembly.
6.
Install new o-ring (26).
EMERGENCY VALVE MAINTENANCE--Continued
0130 00-7