Custom Search
 
  
 


TM 9-2330-330-14&P
VOLUMETRIC METER AND PIPING REPLACEMENT--Continued
0127 00
1.
Remove two nuts (12), bolts (13), split coupling (10), and seal (11) from pipe (14). Discard seal.
2.
Remove four nuts (8), lockwashers (9), flange (7), and gasket (6) from volumetric meter assembly
(1). Discard lockwashers and gasket.
3.
Remove four nuts (5), lockwashers (4), flange (3), and gasket (2) from meter assembly (1). Discard
lockwashers and gasket.
WARNING
Volumetric meter assembly is very heavy. Get help to lift
meter assembly from semitrailer.
4.
Remove three bolts (15), lockwashers (16), and meter assembly (1) from semitrailer. Discard
lockwashers.
0127 00-2



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business