Tweet |
Custom Search
|
|
|
||
TM 9-2330-330-14&P
VAPOR RECOVERY SYSTEM REPLACEMENT--Continued
0122 00
INSTALLATION
1.
Install pipe (18), U-bolt (17), two washers (16), and new self-locking nuts (15) to semitrailer.
2.
Install two split pipe couplings (22), new seals (21), four bolts (20), and nuts (19) to pipe (18).
3.
Install pipe (27), three U-bolts (26), six washers (25), and new self-locking nuts (24) to three
brackets (23).
0122 00-3
|
||