Custom Search
 
  
 


TM 9-2330-330-14&P
ENGINE CONTROL PANEL MAINTENANCE--Continued
0120 00
17.
Install tachometer (21), bracket (20), and two new self-locking nuts (19) to control panel (2).
18.
Connect three wires (5) and nuts (4) to tachometer (21).
19.
Install voltmeter (9), bracket (8), two new star washers (7), and nuts (6) to control panel (2).
20.
Connect two wires (12), new starwashers (11), and screws (10) to voltmeter (9).
21.
Install hourmeter (18), bracket (17), and new self-locking nut (13) to control panel (2).
22.
Connect two wires (16), new lockwashers (15), and screws (14) to hourmeter (18).
23.
Install six screws (1) and control panel front cover (2) to control panel frame (3).
FOLLOW-ON TASKS
1.
Reconnect negative battery terminal (WP 0007 00).
2.
Disconnect semitrailer grounding cables (WP 0007 00).
END OF TASK
0120 00-14



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business