Custom Search
 
  
 


TM 9-2330-330-14&P
ENGINE CONTROL PANEL MAINTENANCE--Continued
0120 00
3.
Install control panel (2), four bolts (68), eight washers (67), and four new self-locking nuts (66) to
semitrailer.
4.
Apply new silicone bead (64) to edges of cutout (65) at the control panel rear (2).
5.
Install gage (63), two screws (62), and two new self-locking nuts (61) to control panel (2).
6.
Install three gages (57), six brackets (60), and new teflon nuts (59) to control panel (2).
7.
Install four hose fittings (58) to three gages (57).
0120 00-9



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business