Custom Search
 
  
 


TM 9-2330-330-14&P
HAZARDOUS MATERIALS PLACARD HOLDERS/BRACKETS REPLACEMENT--Continued 0102 00
INSTALLATION
1.
Install hazardous materials placard bracket (13), U-bolt (10), two washers (11), and new self-
locking nuts (12) to vapor recovery pipe (9) at rear of semitrailer.
2.
Install hazardous materials placard bracket (5), three bolts (6), six washers (7), and three new self-
locking nuts (8) at roadside of semitrailer.
3.
Install hazardous materials placard bracket (4) as a unit, two bolts (3), four washers (2), and two
new self-locking nuts (1) at front of semitrailer.
FOLLOW-ON TASK
Disconnect semitrailer grounding cables (WP 0007 00).
END OF TASK
0102 00-3/4 blank



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business