Custom Search
 
  
 


TM 9-2330-330-14&P
AIR TUBING AND FITTINGS MAINTENANCE--Continued
0076 00
PUSH-IN FITTINGS REMOVAL
Depress collar (10) and disconnect tubing (11).
PUSH-IN FITTINGS INSTALLATION
NOTE
Air tubing is stocked in bulk lengths. Measure original air
tubing and cut new tubing to same length. Trim ends of
tubing to get a smooth, square cut.
1.
Install tubing (11) into fitting (12) until tubing bottoms out.
2.
Pull on tubing (11) to verify it is fully installed.
TEST
NOTE
Semitrailer must be coupled to a prime mover or to an
air source at the Schrader valve to perform test.
Apply soapy water to air tubings and fittings and check for leaks. If a compression sleeve fitting leaks
during test, tighten nut. If a push-in fitting leaks during test, verify tubing is bottomed out. If tubing leaks,
replace tubing.
FOLLOW-ON TASK
Disconnect semitrailer grounding cables (WP 0007 00).
END OF TASK
0076 00-5/6 blank



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business