Tweet |
Custom Search
|
|
|
||
TM 9-2330-330-14&P
SPRING BRAKE CONTROL VALVE MAINTENANCE--Continued
0074 00
INSTALLATION
NOTE
Apply thread sealing compound to threads of fittings.
1.
Install four fittings to valve (2).
2.
Install valve (2) to air reservoir fitting (3).
3.
Connect four air lines (1) to valve (2).
TEST
Test all components for leakage (WP 0076 00).
FOLLOW-ON TASK
Disconnect semitrailer grounding cables (WP 0007 00).
END OF TASK
0074 00-2
|
||