Custom Search
 
  
 


TM 9-2330-330-14&P
Use this procedure to pump fuel from semitrailer to
storage facility.
Operation begins and ends with all valves closed.
a. Remove fire extinguishers (1) and bring them to the point of operation.
b. Ground and bond semitrailer per para. C (WP 0007 00-6).
c.
Remove one or both vapor recovery system caps.
d. Start engine (para. G). When engine is warm, adjust to idle speed (10001200 rpm).
e. Remove 4-in. hose (2) from hose tube (3) and connect hose (2) between outlet B (6)
and fuel storage facility.
f.
Pull emergency valve A control handle (8) to open position. Open valves B, H, M, and
K (4, 7, 9, and 5).
OPERATION UNDER USUAL CONDITIONS--Continued
0007
g. Adjust engine speed to desired flow rate (290320 gpm [10981211 Lpm] @ 22002400 rpm).
h. Shut off engine after delivery is complete.
i.
Drain hose (2) into suitable container.
j.
Close all valves and vapor recovery system vent caps.
k.
Remove and store hose (2) in hose tube (3).
l.
Remove grounding cables.
0007 00-25



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business