Tweet |
Custom Search
|
|
|
||
TM 9-2330-330-14&P
c.
Remove one or both vapor recovery system caps.
d. Start engine (para. G). When engine is warm, adjust to idle speed (10001200 rpm).
e. Remove 4-in. hose (3) from hose tube (2) and connect hose (3) between outlet B (5)
and fuel storage facility.
f.
Pull emergency valve A control handle (7) to open position. Open valves B, F, and
H (4, 5, and 6).
g. Adjust engine speed to desired flow rate (290320 gpm [10981211 Lpm] @ 22002400 rpm).
h. Shut off engine after delivery is complete.
i.
Close all valves and vapor recovery system vent caps.
j.
Drain hose (2) into suitable container.
k.
Remove and store hose (2) in hose tube (3).
l.
Remove grounding and bonding cables.
m. Store and cover fire extinguisher (1).
OPERATION UNDER USUAL CONDITIONS--Continued
0007 00-20
|
||